Leighton Buzzard Railway Posted on 10 August 2009 by admin LB 19-7-2009 LB 19-7-2009 Loc shed at Leighton Buzzard LB 19-7-2009 Beldwin build LB 19-7-2009 LB 19-7-2009 LB 19-7-2009 LB 19-7-2009 LB 19-7-2009 Loc 4 at Stonehenge Works Stonehenge Works now the terminus but not for long. View on the 1 km relaid line to Duoble Arches LB 19-7-2009 Stonehenge Works ex WD petrol engine LB 19-7-2009 Sand loading demonstration at Stonehenge Works LB 19-7-2009 Stonehenge Works station with a train ready for returning to Leighton Buzzard 19 7 2009