Shibanxi:
The railway put three electrical locos, built in 6/2000 in October in service between the powerplant and the first station, so all steam operation with freight trains is finished. But the passengers remain steam. The area is more sensitive for gricers than last year, some enthusiasts here were denied to enter the area. But the staff is still very kindly. Beside the three electrical locos (0-4-0) they still have the dumped Mudanjang-diesels (two) and five C2 (three serviceable). Numbers later, after my arrival in Germany end of December.
text by; Bernd Seiler after our Nov 2000 visit to this line.
Shibanxi:
-
3 November 2000 Shixi – Shibanxi yark before the workshop with at that time one of the new elocs. -
Shixi. 3 Nov 2000 when a long coal loaded train is pushed through the unloading pits. -
Zaiziba private use of the line. Not difficult with 4 pairs of trains each day 3 November 2000 -
C2 locomotive leaving the tunnel 1 km after Mifung on 3 November 2000 -
Shibanxi sun rise at 3 November 2000 -
Sjenzhenjiao the onlt station with a shelter 3 November 2000