Deutsche Steinkohle AG Bergwerk West – Kamp Lintfort Posted on 07 March 2011 by admin Bergwerk West Kamp-Lintfort Uter Tage meter 1050 Kolenvergruizer – Kohle Zerstäuber – Coal pulverizer 22-6-2004 Bergwerk West Kamp-Lintfort Uter Tage 1050 meter Teif 22-6-2004 22 June 2004 Kamp Lintfort RAG Bergbau West with RAG diesellocs 518 and 547. This coal mine is still very active and produces coal that makes a good quality cokes. It ill be closed end 2012 22 juni 2004 Bergbau West te Kamp Lintfort. Unter Tage 1100 meter tief. Or 1100 meter below ground. On the photo a large lifting device that holds up the tunnel roof on the corner were the work tunnel and the transport tunnel meet. It is able to walk forwards and follow the explatation progress of the work. Its here were the coal comes from that fills the trains on ground levell. 22 June 2004 Bergbau West Kamp-Lintfort 1100 meter “Unter Tage”. Mechanics are busy installing and testing the equipment that will almost automatically scrape 8000 tones of coal every 24 hours. The coal field is on this spot between 2 and 2,5 meter thick. The length off the winning tunnel is 270 meter. Some 1100 meter deep in the coal layer. The hight is here between 2 and 2,5 meter and this winning tunnel follows the coal field. On the left the hydrailic struts that computerised will walk forward (to the right) on the moment the winning on the right side starts. This transport equipment moves the coal away. The winning field is on the right side. With my back to the lift at -1000 meter view into a long transport tunnel to other production area 13 May 2011 Kamp-Lintfort RBH641 13 May 2011 Kamp-Lintfort RBH641 RAG Forderturm 1 13 May 2011 Kamp-Lintfort RBH641 Ladestelle Forderturm 2 13 May 2011 Kamp-Lintfort RBH641 at Bf Rheinkamp Nach Probebohrungen in den Jahren 1901